THE KITCHEN

I only just realized that I built, shot and struck the bedroom set without taking a single production still.  The first couple of minutes of DRAIN (which are now complete) take place in 5 different locations. The scenes are very short but they set up the 2 major set pieces which is where I find myself. It’ll likely take me a week or two to finish building the main kitchen. By contrast the animation that follows will take months.